On-Site Audit
On-Site Solar Plant Audit
A boots-on-the-ground inspection of modules, inverters, cabling and safety — with a prioritized rectification report you can act on.

Audit Scope
What we inspect on the ground
Our certified engineers perform a full physical health check across every system that drives your plant’s yield and safety.
Module & Array Inspection
Thermal imaging and visual checks surface micro-cracks, hotspots, soiling, and physical damage across every module and string.
Inverter & Electrical Health
Insulation-resistance tests, torque checks on terminations, and inverter performance validation against design benchmarks.
Cabling & Safety Compliance
DC/AC cabling integrity, earthing, protection devices, and structural safety — documented with a prioritized rectification report.
Suitability
When should you book an on-site audit?
- Inherited or acquired a plant with unknown history
- A poor generation year or an active warranty dispute
- Before renewing an annual O&M contract
- Post-storm or post-installation commissioning checks
What we need to begin
01
Site Access Window
A 4–6 hour access slot for our engineers to complete the full inspection.
02
Plant Drawings & SLD
Single-line diagrams and module layout, if available, to map findings precisely.
Process & Timeline
From site visit to rectification roadmap
Every audit follows a structured, evidence-led path — from first access to a fixed-scope fix plan.
01
Pre-Visit Briefing
Engineers arrive with your plant drawings, string logs, and targeted diagnostic goals.
02
On-Site Inspection
Thermography, IV curve tracing, and electrical testing across modules, inverters, and cabling.
03
Findings Report
A prioritized rectification report with photographic evidence and severity ratings.
04
Rectification Plan
A fixed-scope, fixed-price roadmap to restore your plant to its design yield.
Proven Results
Faults our on-site audits have uncovered
Real examples of hidden faults caught on the ground before they became failures.

5MW Commercial Rooftop Chennai
Uptime stabilized at 99.1% with systematic chemical washing cycles, yielding an extra ₹42L annually.

3MW Industrial Complex Pune
Custom retrofitting of cabling and optimized string layout protected plant against regular grid surges.

8MW Ground-Mount Gujarat
Drone-based thermography resolved critical hotspots, restoring 18% lost generation within two weeks.
COMMON QUESTIONS
On-Site Audit FAQs
Do I need to be present during the audit?
No. You only need to provide site access. Our engineers document the entire inspection with timestamped photos and readings, so you receive a complete evidence pack without being on-site.
How long does an on-site audit take?
Most commercial and industrial plants are fully inspected within a 4–6 hour window. Larger utility-scale sites may take a full day, which we confirm in advance.
What do I get in the report?
A prioritized rectification report with severity ratings, photographic evidence, and raw test readings — so you can act independently or hand the fixes to our certified team.
Is the audit disruptive to plant operations?
Minimally. We schedule inspections around your generation peaks and perform non-invasive testing wherever possible, keeping downtime close to zero.
Get in touch
Let’s talk about your solar assets.
We respond within 4 hours on all business days. No automated queues — a real engineer picks up every enquiry.